Concrete Footing Calculator: Yards and Bags

Estimate concrete for continuous strip footings under walls, or for a set of identical pad footings under posts and piers. Enter the total run (or one pad's size and a quantity), the width and the depth.

Restored your last inputs

Concrete volume 1.45 yd³80 lb bags: 66Concrete volume 1.06 m³25 kg bags: 91 (jump to all results)
ftm

incm

incm

%

Prices and costs (optional)
$ / yd³$ / m³

$ / 80 lb bag$ / 25 kg bag

$

%

%

Delivery, markup and tax are added to the materials total: markup on materials + delivery, then tax on everything. Estimates are rounded to whole currency units.

Results

Concrete volume1.45 yd³ (39.1 ft³)1.06 m³
Ready-mix order (rounded up to ¼ yd³)Ready-mix order (rounded up to 0.25 m³)1.5 yd³ (40.5 ft³)1.25 m³
40 lb bags20 kg bags131113
60 lb bags25 kg bags8791
80 lb bags40 kg bags6657

Bags or truck: over about 1 yd³, ready-mix is usually cheaper and easier than 66 × 80 lb bags. Many plants add a short-load fee below about 3–5 yd³, so ask for their minimum. Approximate.Bags or truck: over about 0.75 m³, ready-mix is usually cheaper and easier than 113 × 20 kg bags. Many plants add a short-load fee below about 2–4 m³, so ask for their minimum. Approximate.

Length 40 ftWidth 16 inDepth 8 in

Strip footings vs. pad footings

Strip (continuous) footings run under a wall, such as a garage, an addition, a block wall or a foundation. You enter the total length of footing, its width and its depth.

Pad (spread) footings are square or rectangular blocks under individual posts or columns, like a deck, pergola or carport. Enter the length of one pad as "Footing length" and set "Number of footings". For a 24 × 24 in pad, enter 2 ft for the length and 24 in for the width.

For round footings poured in tube forms, use the column calculator. For a footing that combines a tube with a wider base, add the two results together.

Measuring a footing run without double-counting corners

On a rectangular foundation, the easy mistake is adding the outside lengths of all four sides. Each corner then gets counted twice. Measure along the centerline of the footing instead. For a 24 × 30 ft garage with a 16 in footing, the centerline perimeter is 2 × (24 + 30) − 4 × (16 ÷ 12) = 102.7 ft, not 108 ft.

Trenches dug in soil are rarely perfectly square. Measure the actual width and depth in several places after digging, and use the average if they vary.

Formula

Volume = length × (width ÷ 12) × (depth ÷ 12) × number of footings, with width and depth in inches and the result in cubic feet. Divide by 27 for cubic yards. With the defaults (40 ft run, 16 in wide, 8 in deep) that's 40 × 1.333 × 0.667 = 35.6 ft³, and 1.45 yd³ (39.1 ft³) with 10% waste.

How big should a footing be?

Footing size depends on the load, the soil's bearing capacity and local code, so the calculator defaults are not design values. For context, the International Residential Code (Section R403.1.1) sets a minimum width of 12 in and a minimum thickness of 6 in for concrete footings, with larger sizes in its tables depending on soil, the number of stories and snow load. Footings also have to sit below the local frost depth, which your building department publishes.

Strip footing volume per 10 ft, by size
FootingWidth × depthConcrete per 10 ft run (no waste)
IRC minimum12 × 6 in0.19 yd³ (5 ft³)
Example16 × 8 in0.33 yd³ (8.9 ft³)
Example20 × 10 in0.51 yd³ (13.9 ft³)
Example24 × 12 in0.74 yd³ (20 ft³)
Strip footing volume per 3 m, by size
FootingWidth × depthConcrete per 3 m run (no waste)
About the IRC minimum30 × 15 cm0.135 m³ (135 L)
Example40 × 20 cm0.24 m³ (240 L)
Example50 × 25 cm0.375 m³ (375 L)
Example60 × 30 cm0.54 m³ (540 L)

Deck and pergola pads are usually set by the post load and the soil. Prescriptive guides like the American Wood Council's DCA 6 give footing sizes for decks built to its rules.

Worked examples

Garage footing, 102.7 ft centerline, 16 × 8 inGarage footing, 31.3 m centerline, 40.6 × 20.3 cm

Footing length 102.7 ft · Footing width 16 in · Footing depth 8 in · Number of footings 1 · Waste / overage 10 %Footing length 31.3 m · Footing width 40.6 cm · Footing depth 20.3 cm · Number of footings 1 · Waste / overage 10 %

  • Concrete volume: 3.72 yd³ (100.4 ft³)Concrete volume: 2.84 m³
  • 80 lb bags: 16840 kg bags: 152

Pergola: four 24 × 24 in pads, 12 in deepPergola: four 61 × 61 cm pads, 30.5 cm deep

Footing length 2 ft · Footing width 24 in · Footing depth 12 in · Number of footings 4 · Waste / overage 10 %Footing length 0.61 m · Footing width 61 cm · Footing depth 30.5 cm · Number of footings 4 · Waste / overage 10 %

  • Concrete volume: 0.65 yd³ (17.6 ft³)Concrete volume: 0.498 m³ (498 L)
  • 80 lb bags: 3040 kg bags: 27
  • 60 lb bags: 4025 kg bags: 43

This is small enough for bags. Check that the bottom of each pad is below frost depth.

Garden block wall, 30 ft long, 20 × 10 in footingGarden block wall, 9.14 m long, 50.8 × 25.4 cm footing

Footing length 30 ft · Footing width 20 in · Footing depth 10 in · Number of footings 1 · Waste / overage 10 %Footing length 9.14 m · Footing width 50.8 cm · Footing depth 25.4 cm · Number of footings 1 · Waste / overage 10 %

  • Concrete volume: 1.7 yd³ (45.8 ft³)Concrete volume: 1.3 m³
  • 80 lb bags: 7740 kg bags: 70

Tips from the trench

  • Keep trench sides clean and vertical where the soil allows. Sloughed soil in the bottom reduces bearing and mixes into the concrete.
  • Pour footings on undisturbed or properly compacted soil. Never pour on loose fill, frozen ground or standing water.
  • Place rebar on supports (chairs or bricks) so it sits with the required cover. ACI 318 calls for 3 in of cover where concrete is cast against earth. The rebar calculator handles bar counts.
  • Get your inspection before the pour. Many jurisdictions inspect footing trenches and rebar before concrete goes in.

Trench pour or formed footing?

Where the soil holds a clean vertical face, many footings are poured straight into the trench (an "earth-formed" footing), and the trench dimensions become the footing dimensions. In sandy or crumbly soil, or where the footing sits partly above grade, builders set wood forms. With a formed footing, measure the inside of the forms. With a trench pour, measure the trench itself in several places, because a trench dug 2 in wider than planned along 100 ft of footing adds noticeable volume.

Common mistakes

  • Double-counting corners by adding outside lengths. Use the centerline.
  • Underestimating an over-dug trench. A 16 in footing that ends up 18 in wide along 100 ft needs 11.1 ft³ more concrete at 8 in deep.
  • Pouring before inspection. Footing trenches and rebar are often inspected before concrete goes in.
  • Mixing bags for a big footing. Long footing runs quickly reach ready-mix volumes. One continuous pour avoids cold joints.

Checked against

Each case below is re-run against the calculator by our automated test suite.

CaseOur resultChecked againstResult
40 ft run, 16 in wide, 8 in deep, no waste: volume1.32 yd³ (35.6 ft³)Hand calculationMatch
CaseOur resultChecked againstResult
12.2 m run, 40.6 cm wide, 20.3 cm deep, no waste: volume1.01 m³Hand calculationMatch

Frequently asked questions

What is the minimum footing size for a house?

The IRC minimum is 12 in wide and 6 in thick, but the required size often goes up with soil type, the number of stories and snow load. Your local code and plans govern.

How deep should footings be?

Below the local frost line, which ranges from a few inches in warm climates to several feet in cold ones. Ask your building department.

How many bags of concrete for a deck footing?

A 24 × 24 × 12 in pad is 4 ft³, about 7 bags of 80 lb mix before waste.

Should I subtract rebar volume?

No. Rebar takes up well under 1% of the volume.

Sources & assumptions

The results are planning estimates, and the cost figures only use prices you enter. Product yields, densities and coverage rates vary, so check the label or ask your supplier, and follow local codes. Figures marked "approximate" or "rule of thumb" are general practice, not exact standards.

See how we calculate and test our formulas and the changelog. Last updated 2026-10-08.

Reviewed by the MaterialWhiz Editorial Team. This estimate uses the assumptions shown in the calculator. Review the result against your supplier's product coverage and site conditions. Last reviewed: October 10, 2026. See how we calculate · Report a correction.

Before you buy

Before ordering, confirm the manufacturer’s stated yield for the exact bag size or mix. Check whether reinforcement, forms, chairs, delivery, and a pump or mixer are separate from the concrete quantity. For structural work, follow the plans and local code rather than relying on an estimate alone.

Commercial note: If this page includes product links, some may be affiliate links. See the affiliate disclosure.

Related calculators