Sod Calculator: How Much Sod Do I Need?

Calculate how much sod to order, how many pieces or rolls that is, how many pallets, and the topsoil for a thin prep layer.

Restored your last inputs

Sod to order 1,050 ft²Pallets: 3Sod to order 105 m²Pallets: 3 (jump to all results)
ft²m²

Measure it: length × width

%

ft²m²

ft²m²

Prices and costs (optional)
$ / each

$

%

%

Delivery, markup and tax are added to the materials total: markup on materials + delivery, then tax on everything. Estimates are rounded to whole currency units.

Results

Sod to order1,050 ft²105 m²
Pieces / rolls394105
Pallets3
Topsoil for 1 in prep layerTopsoil for a 2.5 cm prep layer3.09 yd³ (83.3 ft³)2.54 m³

Area 1000 ft²

Measure the lawn area

rectangletrianglehalf circle
Split curved or angled beds into simple shapes, find each area with the square footage calculator, then add them.

Measure each rectangular section in feet and add the areas together. Subtract beds, patios and paths that won't be turfed. For curves, the square footage calculator handles circles and triangles. Then enter the total here.

How the order is figured

Sod to order = lawn area × (1 + waste). Pieces = area ÷ piece size. Pallets = area ÷ pallet coverage. Piece and pallet sizes vary by farm. Small pieces are often around 16 × 24 in (2.67 ft²). Purdue Extension notes that rolls are typically 18 in × 6 ft or 24 in × 5 ft (9 or 10 ft²), and pallets commonly cover somewhere around 400–500 ft² (approximate). Ask your supplier for their exact sizes and type them in. With the defaults (1,000 ft², 5% waste, 450 ft² pallets) you'd order 1,050 ft²: 3 pallets.

Sod for common areas

Lawn areaWith 5% waste16 × 24 in piecesPallets (450 ft²)
100 ft²105 ft²401
200 ft²210 ft²791
300 ft²315 ft²1191
500 ft²525 ft²1972
800 ft²840 ft²3152
1000 ft²1,050 ft²3943
2000 ft²2,100 ft²7885
5000 ft²5,250 ft²1,96912
Lawn areaWith 5% waste1 m² rollsPallets (50 m²)
10 m²10.5 m²111
20 m²21 m²211
30 m²31.5 m²321
50 m²52.5 m²532
75 m²78.8 m²792
100 m²105 m²1053
200 m²210 m²2105
500 m²525 m²52511

Soil preparation

Sod roots into the soil below it, so prep matters more than the sod itself. Penn State and Purdue Extension guidance boils down to this:

  1. Kill or remove existing weeds and old turf.
  2. Test the soil and apply lime or fertilizer as the test recommends.
  3. Rough-grade so water drains away from buildings. Penn State suggests a gentle 1–4% slope away from foundations. Where topsoil is thin, add at least 4–6 in of quality topsoil and blend it into the surface (Penn State).
  4. Final-grade, rake smooth, and lightly roll. Lightly water the soil before laying.

The calculator's topsoil line is just a thin 1 in prep layer. If you need a full 4–6 in, use the topsoil calculator.

Laying and watering

  • Lay sod as soon as it's delivered. Purdue Extension advises sod that is delivered and installed within 24 hours of harvest, because it heats up and deteriorates on the pallet.
  • Water the soil a day or so before installation. Purdue warns that laying sod on dry, hot soil slows rooting even if you water right after.
  • Start along a straight edge, butt pieces tightly, and stagger the joints like brickwork.
  • On slopes, lay pieces across the slope, and peg them if needed.
  • Roll to press the sod into the soil, then water thoroughly so the soil underneath is moist (Purdue). Keep it moist until the roots knit. Purdue says most grasses root well within 10–14 days in good conditions, and calls lack of irrigation the number one problem with new sod. After that, water less often and more deeply.

Worked examples

Back lawn, 40 × 30 ft minus a 10 × 12 ft patio (1,080 ft²)Back lawn, 12.2 × 9.14 m minus a 3.05 × 3.66 m patio (100 m²)

Lawn area 1,080 ft² · Waste / overage 5 % · Piece / roll size 2.667 ft² · Pallet coverage 450 ft²Lawn area 100.34 m² · Waste / overage 5 % · Piece / roll size 0.25 m² · Pallet coverage 41.81 m²

  • Sod to order: 1,134 ft²Sod to order: 105.4 m²
  • Pieces / rolls: 426
  • Pallets: 3
  • Topsoil for 1 in prep layer: 3.33 yd³ (90 ft³)Topsoil for a 2.5 cm prep layer: 2.55 m³

Curvy front lawn, 650 ft², 10% waste, 10 ft² rollsCurvy front lawn, 60.4 m², 10% waste, 0.93 m² rolls

Lawn area 650 ft² · Waste / overage 10 % · Piece / roll size 10 ft² · Pallet coverage 450 ft²Lawn area 60.39 m² · Waste / overage 10 % · Piece / roll size 0.93 m² · Pallet coverage 41.81 m²

  • Sod to order: 715 ft²Sod to order: 66.4 m²
  • Pieces / rolls: 72
  • Pallets: 2

When to lay sod

Sod can go down whenever the ground isn't frozen and you can keep it watered, but timing still matters. Cool-season grasses (Kentucky bluegrass, tall fescue, ryegrass) root fastest in the cooler, moist weather of spring and late summer to early fall. Penn State identifies mid-to-late spring and late summer to early fall as the best times to seed cool-season turf in Pennsylvania, and the same weather favours sod. Warm-season grasses (bermuda, zoysia, St. Augustine) are usually laid from late spring through summer, while they're actively growing. Purdue notes that sodding bermudagrass in early summer lowers the risk of winterkill. In hot weather, plan on more frequent watering for the first two weeks.

Common mistakes

  • Ordering by the outside dimensions of the yard without subtracting beds, the patio and paths.
  • Letting pallets sit in the sun overnight. Lay the outer edges and odd corners first if you can't finish in a day, and keep the pallet shaded and moist.
  • Short, narrow strips at the edges. Purdue notes they dry out quickly. Put full pieces at the edges and cut the pieces further in.
  • Using pre-emergent herbicide shortly before sodding. Purdue advises avoiding herbicides other than glyphosate within two months before installation, because some reduce rooting.
  • Under-watering. Lift a corner after watering. The soil underneath should be moist, not just the grass.

Checked against

Each case below is re-run against the calculator by our automated test suite.

CaseOur resultChecked againstResult
1,000 ft² lawn, 5% waste, 450 ft² pallets3Hand calculationMatch
CaseOur resultChecked againstResult
92.9 m² lawn, 5% waste, 41.8 m² pallets3Hand calculationMatch

Frequently asked questions

How much sod do I need for 1,000 square feet?

About 1,050 ft² with 5% waste: roughly 394 pieces of 16 × 24 in, or 3 pallets at 450 ft² each.

How much sod is on a pallet?

It varies by farm, often roughly 400–500 ft². Ask your supplier.

How much extra sod should I order?

5% for simple rectangles and 10% for curves and lots of beds.

Can I lay sod on existing grass?

Extension guidance is to remove or kill existing vegetation and prepare the soil first, so the new roots reach real soil.

Sources & assumptions

The results are planning estimates, and the cost figures only use prices you enter. Product yields, densities and coverage rates vary, so check the label or ask your supplier, and follow local codes. Figures marked "approximate" or "rule of thumb" are general practice, not exact standards.

See how we calculate and test our formulas and the changelog. Last updated 2026-10-08.

Reviewed by the MaterialWhiz Editorial Team. This estimate uses the assumptions shown in the calculator. Review the result against your supplier's product coverage and site conditions. Last reviewed: October 10, 2026. See how we calculate · Report a correction.

Before you buy

Before ordering, confirm the product’s coverage rate for your soil, sun, season, and intended use. Ask about delivery timing, storage, installation window, and whether the supplier recommends a starter product or soil preparation.

Commercial note: If this page includes product links, some may be affiliate links. See the affiliate disclosure.

Related calculators